We have been manufacturing industrial furnaces and production systems since 2006

Gumen Makina builds industrial furnaces and integrated production systems for aluminium casting, extrusion and heat treatment plants. Mechanical design, process calculation and automation come together in one team; we deliver a line from start to finish through a single point of contact. Our production and engineering centre is in Çayırova, Kocaeli.

How we work

We plan first, then we design

When we enter a plant, our first job is to read the existing line: real capacity, charging regime, energy infrastructure, crane height, the free square metres left on site. Design starts only after that. A furnace picked from a catalogue most often either runs well below its capacity or does not fit into the line; either way it comes back in the end as a fuel bill. That is why, instead of a standard product list, we give each plant a system designed around its own constraints.

Projects we have completed
Gumen Makina’s production and engineering centre in Çayırova, Kocaeli
20+
years serving the aluminium industry.
9+
turnkey plants built.
7
countries exported to.
2
From Türkiye and Romania to the whole world…
  • End-to-End

    Engineering

  • Energy

    Efficiency

  • Turnkey

    EPC

  • After-Sales

    Support

Our History

From 2006 to today

Gumen Makina’s first workshop in Çayırova, 2006
2006

Founded in Çayırova

Founded in Çayırova, Kocaeli, to manufacture industrial furnaces and equipment for aluminium plants.

The first turnkey aluminium line, delivered in 2009
2009

First turnkey line

A complete line was delivered to an aluminium plant, with design, manufacturing and commissioning all handled by a single supplier.

PLC control panel and SCADA screen prepared by our own team
2013

Automation moved to our own team

PLC and SCADA software is now written in-house. Control panels, process recipes and fault scenarios began to be designed together with the furnace, at the same table.

Casting and heat treatment line installed in Azerbaijan
2018

First overseas project: Azerbaijan

A complete casting and heat treatment line was installed at an aluminium plant in Azerbaijan.

Ultrasonic test system measuring billets on the line
2022

Ultrasonic billet test system

An ultrasonic test system that measures the billet’s internal structure in-line was developed; the system is now patent-pending. There is no need to take samples or stop production.

Furnace body being prepared for shipment
2024

Exports reached seven countries

With projects in the Middle East, Central Asia and Europe, the number of countries we do business with reached seven.

Gumen Engineering S.R.L. office in Romania
2025

Gumen Engineering S.R.L. in Romania

A group company was established in Romania to serve the European Union (EU) market locally. EU project management, CE certification and service in the Balkans are run from this office. Our Group Companies

Our quality promise

We stand behind our quality

We deliver systems that provide maximum performance and reliability. Our quality is assured by 20 years of experience in industrial furnace manufacturing, an engineering staff that brings mechanical design, process calculation and automation under one roof, and a manufacturing team in our own workshop.

Traceable production
The temperature curve, duration and alarms of every load are recorded in SCADA. When a batch is queried months later, the recipe it was processed with and the conditions it was processed under come up on screen.
Patent-pending NDT inspection
Our ultrasonic test system scans the billet without taking it off the line. A product with a defect in its internal structure is separated before it moves to the next station; there is no need to stop production to take samples.
Process-focused design
The furnace is calculated for the alloy to be processed and the charging regime. Heat load, burner capacity, air circulation and cycle time are worked out while the design is still on the drawing board.
Long-life construction
Refractory and insulation thickness are selected for the operating temperature, and the supporting structure for the expansion caused by heating and cooling cycles. The target is the maintenance cost of the tenth year, not the first.
Site-specific design and integration
New equipment goes into a working plant, not an empty site. Tie-in points to the existing line, downtime and commissioning sequence are planned at the start of the project; installation is most often fitted into the production schedule.

Certificates and standards

  • AMS 2750 Pyrometry Standard
  • CE Compliant Machinery Directive
  • ATEX Explosion Protection
  • ISO 9001 Quality Management
  • Patent-pending UT Ultrasonic Test
Let’s work together

Run your project with a single point of contact

You get design, manufacturing, installation and commissioning from the same team. Tell us what you need, and we will define the scope and schedule together.

Request a Quote

From design to commissioning, we carry out every step with our own team