Automatic Saw and Ultrasonic Testing System

We combine the automatic saw and ultrasonic testing on a single line

We scan the internal structure of the billet automatically, immediately after cutting and without stopping the line. A part with a defect is marked and separated from the flow, and the test report is recorded together with the casting parameters. We build the system with reference to the EN 12258 and ASTM B594 standards and define the acceptance criteria according to your customer specification.

Method
Pulse-echo UT
Diameter range
75 – 300 mm
Position
In-line, after cutting
Output
Defect map + report
Data sheet

Ultrasonic testing system technical specifications

Test method
Pulse-echo ultrasonic, water-coupled scanning
Scanning
360° across the billet cross-section
Diameter range
75 – 300 mm
Cutting unit
Automatic saw; synchronised with line speed
Transfer
Automatic transfer from the cutting unit to the test station
Decision
Part is marked when the threshold value is exceeded — the line does not stop
Reporting
Defect map and test report (PDF) for each billet
Correlation
Matching with casting speed, temperature and water flow rate data
Control
PLC + SCADA; logging to the production database
Status
System patent-pending
Retrofit
Can be added later to existing casting lines

What is ultrasonic testing?

A high-frequency sound wave is passed through the metal. If there is a crack, void or density difference in its path, the wave is reflected from it; the returning echo is read by the sensor, and the location and size of the defect are derived from it. The method is non-destructive and involves no radiation. It is widely required for billet acceptance in aerospace, defence and automotive supply chains.

How it works

Testing runs from cutting to report in five steps

1

Casting and cutting

The casting machine produces billets of the specified diameter and length; the automatic saw integrated into the line does the cutting.

2

Automatic transfer

The cut billet is transferred to the test station along the line. No operator intervention.

3

Scanning

Water-coupled probes scan the billet cross-section through 360°; echo data is collected.

4

Evaluation

The software compares the echoes against threshold values. A part that exceeds the limit is marked, and the line flow does not stop.

5

Reporting

A defect map and a test report are generated for each billet, correlated with the casting parameters and archived.

Models

We install the system on new lines and on lines already in operation

Complete package

Automatic Saw + UT Station

For new casting lines. Cutting and scanning in a single unit, running in sync with line speed.

Main unit

UT Station Only

For lines that already have a cutting unit. A test station is added to the transfer line.

Refurbishment

Retrofit Package

Adaptation to casting lines not built by Gumen. The transfer distance and control interface are examined on site.

Additional unit

Weighing and Packing Module

Stacking, weighing and packing after testing; details are on the Automatic Loading and Unloading page.

Additional unit

Report Integration

Production database or ERP connection; details are on the PLC / SCADA Systems page.

Highlights

Four things set this system apart

Testing happens inside the line

As soon as the billet is cut, it is scanned without the line stopping. Moving to a separate test station and waiting there are eliminated.

The defect is recorded together with its source

The scan data is matched with the casting speed, temperature and water flow rate. When a defect appears, you can see which parameter deviated.

The system produces the report

A defect map and a test report are produced automatically for every billet. No separate paperwork has to be prepared for customer audits or export.

Installs on existing lines too

On a line that has a cutting unit only the test station is added; on one that does not, it is added together with the saw. In both cases it communicates with the existing control system.

We answer frequently asked questions
about the ultrasonic testing system

No. Scanning is carried out while the billet is being transferred after cutting and is sized to the line speed. The line does not stop when a defective part is found either; only that part is marked and separated.

Internal cracks, gas voids and segregation zones that create density differences. The threshold values are set according to the standard you work to and the customer specification.

A patent application has been filed; this information will be updated when the registration process is complete. The distinctive aspect of the application is that ultrasonic scan data is recorded simultaneously with the casting machine’s parameters and correlated with them.

As a PDF test report and a defect map for each billet. If required, they can also be supplied in a form that can be transferred to the production database or ERP system.

Yes, if the transfer line has sufficient distance and a suitable control interface. After a site survey we state in writing what will be added and what will be adapted.

Let us add testing to your line

Let us survey your casting line on site

What diameters of billet do you cast, how much distance is there in the post-cutting transfer, and which standard do you deliver to? After a site survey we state in writing what will be added.

Request a Quote

From design to commissioning, we carry out every step with our own team