We build furnace and line automation, from hardware to software, from a single source
We develop PLC panels, SCADA screens, recipe management and production reporting for our own furnaces as well as for other brands’ equipment. Upgrading an ageing control system delivers a marked efficiency gain in most plants at a cost far below that of a new furnace.
- PLC
- Siemens / Allen-Bradley
- Protocol
- OPC-UA, Profinet
- Recipe
- Unlimited programs
- Application
- New line / retrofit
PLC and SCADA system technical specifications
- PLC hardware
- Siemens S7-300 / 400 / 1200 / 1500 · Allen-Bradley
- HMI and SCADA
- Siemens WinCC · Wonderware · project-specific interface
- Programming
- Siemens TIA Portal
- Communication
- OPC-UA · Modbus TCP/RTU · Profinet · EtherNet/IP
- Temperature control
- PID, cascade and ramp/soak profiles
- Recipe management
- No limit on the number of process programs
- Data logging
- SQL database, trend charts, alarm logs
- Alarm management
- Priority ranking, escalation, SMS and email notification
- Certificate generation
- Automatic PDF heat treatment certificate
- Remote access
- Secure connection over VPN
- Higher-level system
- API support for MES / ERP integration
- Energy monitoring
- Consumption metering and efficiency reports
- Scope of delivery
- Commissioning, operator training, written maintenance documentation
Why does OPC-UA matter?
A plant usually has equipment from different brands working side by side. If they cannot speak a common language, each machine stays on its own island and no single production overview can be put together. OPC-UA is an open standard that lets PLCs and sensors from different brands communicate securely on the same network. It makes it possible to bring existing equipment into the system without replacing it from scratch, and that is what makes a retrofit economical.
We scale the scope from a single panel to a plant-wide SCADA
Line Automation
Delivered together with the furnace or machine. Hardware, software, commissioning and training in a single package.
Control System Refurbishment
The panel and software of an existing furnace, including equipment of other brands. If the mechanical structure is sound, the cost is far below that of a new furnace.
SCADA Layer
Several units brought together in a single interface. Melting, casting, heat treatment and end-of-line on the same screen.
Certificates and Reporting
Automatic PDF output. Because the data comes straight from the PLC, the document is not edited by hand afterwards.
Remote Access Package
VPN connection and alarm notification. Most faults can be diagnosed without going to site.
Four things set this system apart
The whole line is monitored on one screen
Operators do not learn a separate panel for each unit; alarms, trends and recipes are brought together in a single interface.
Recipes are called up with one button
Hundreds of process programs are stored. Calling up the right program is a single action; no parameters are entered by hand.
The system produces the certificate
The temperature record of every heat treatment cycle becomes a PDF certificate. The document comes out of the furnace; it is not written afterwards.
It can be checked remotely
We access the panel securely over a VPN connection. Most parameter corrections are completed without a service vehicle setting out.
We answer frequently asked questions
about PLC / SCADA
Yes. If the mechanical structure is sound, renewing the control side delivers a marked efficiency gain at a cost far below that of a new furnace. After a site survey, we give the scope in writing.
We work with both. If the plant already has a brand standard, we follow it; for spare parts and maintenance it is usually easier to stay with a single brand.
Recipes, temperature trends, alarm history and load-based production reports are kept on the PLC/SCADA. Because the data comes directly from the controller, there is no document edited by hand afterwards; in audits these records are presented as they are.
Yes, there is standard API support; integration is carried out according to the MES and ERP requirements. If we know which system you use, we can define the scope.
Yes. Operator training after commissioning and written maintenance documentation are part of the delivery.
Which equipment does this system run on?
Tell us the age of your panel, and we will work out the scope of the renewal
Which brand of equipment do you work with, how old are the panels, and which records do you keep by hand? After a site survey, we give the scope and cost in writing.
Request a Quote